Project NameCabrini Hospital – Bunker Demolition
Site Address181-183 Wattletree Rd, Malvern VIC 3144ClientAkalan Projects Pty Ltd 84 Alexander St, Crows Nest NSW 2065Contract Value$250,000 AUDProject Duration2 months (8 Weeks)Start DateFebruary, 2020Main ContractorAkalan Projects Pty Ltd
Description of WorksThis project consisted of the dismantling and full removal of a concrete bunker from the Cabrini Hospital in Malvern. The bunker was constructed of precast concrete blocks and a steel beam filled in-situ concrete roof.

Works were completed with low noise and vibration methods as the hospital remained live throughout the project. Due to the close proximity of the hospital to the bunker all personnel worked with due care and attention to ensure no disruption was caused to patients or staff within the hospital building adjacent.

All concrete blocks / roof sections were lifted out via a mobile crane, loaded onto transport trucks and taken off site.

Due to limited space at the site and the main hospital loading dock situated adjacent to the bunker this project required crucial planning and scheduling of trucks/bin collections to not interrupt critical hospital deliveries and operations.
Management Team
Adrian CassidyProject Director
Gary WaterhouseOperations Manager
Colin RowntreeProject Manager
Peter CoffeyEstimating Manger
Alan GrahamSite Supervisor
Gallery
Casmar Group has an excellent reputation for completing projects on time and within budget.